Onvanto compared with a spreadsheet

Keep the list you have. Add the jobs it cannot see.

Most teams start with an instrument list in Excel, Google Sheets or a SharePoint list. That list is a good start for Onvanto. What a sheet does not show by itself is next Tuesday's job that needs the meter you just sent to the lab.

Prices and export steps come from the sources at the bottom of this page, checked on .

Side by side

What each one does

A shared spreadsheet

  • Little or no extra cost: anyone with a Google Account can use Google Sheets, and Excel for the web is free with a Microsoft account
  • Everyone on the team already knows how to use it
  • You decide the columns: serial number, due date, location, who has it
  • SharePoint lists and Microsoft Lists export to Excel or CSV, and Google Sheets downloads as Excel or CSV
  • It holds what someone typed in, and nothing more

Onvanto

  • Lab trips and jobs on one board, so a clash shows up before the trip starts
  • A qualified person approves a replacement for the whole trip and records the scope and the reason
  • An approval never takes an instrument away from another job, and moving the trip clears it
  • When two planners change the same record, the later change is refused and shown, never saved over
  • An activity log of who changed what
  • Export the planning whenever you want

A sheet can do part of this with formulas, filters and permissions, as long as someone builds and maintains them. In Onvanto those checks are part of the planning.

Price

What a spreadsheet costs

Often nothing extra, because the tool is already there. These two routes are free.

Spreadsheet tools on
ToolFree withWhat the source says
Google SheetsA Google AccountAnyone with a Google Account can create spreadsheets.
Excel for the webA Microsoft accountWord, Excel and PowerPoint are free in the browser.

The cost that never shows on an invoice is the checking: comparing the lab trips in the sheet with the job planning by hand. Onvanto's prices are in the pricing section of the home page.

Switching today

From your sheet to an Onvanto register

This is the route as it works in the Onvanto portal now. It copies your list once; Onvanto does not keep reading the sheet afterwards.

  1. Save the list as a file

    Excel: save as an Excel workbook (.xlsx) or as CSV UTF-8. Google Sheets: choose File, Download, then Microsoft Excel or CSV. SharePoint list or Microsoft Lists: choose Export, then Export to CSV. Microsoft limits a CSV export to 30,000 rows.

  2. Open the import in Onvanto

    Sign in at app.onvanto.com as a member with the qualified grant. On Instruments, choose Import instruments and pick the file. Up to 500 rows per file, CSV up to 1 MB and XLSX up to 5 MB. With an XLSX file you also choose the worksheet.

  3. Choose Excel / CSV and match the columns

    Link your own column names to serial number, name, team and interval in days. Download the transfer template if you want an example. Store serial numbers as text, because Excel can drop leading zeros; a serial number stored as a number is rejected.

  4. Check the rows before anything is saved

    Check rows lists the valid and the rejected rows, each rejection with its row, column and reason. Download the rejections as CSV and fix the sheet, or confirm and import only the valid rows.

  5. Add the latest certificate, then plan

    Use Record calibration or check on an instrument to add its latest outcome and certificate PDF (up to 5 MB). Print the Onvanto QR labels, add your jobs and plan the next lab trip.

What comes over

Serial number, name, team and the calibration interval in days. An interval in months needs converting to days first.

What stays in the sheet

Due dates, statuses, locations and any other columns. The import reads only the four fields above, so keep the sheet as an archive.

An honest choice

Which one fits your team

A good sheet is better than a tool nobody uses. Switch when the sheet stops answering the questions you ask it every week.

A spreadsheet is enough when

  • A handful of instruments rarely go to a lab.
  • One person plans everything and checks clashes by hand.
  • You do not need a record of who approved a replacement.

Onvanto fits better when

  • Instruments spend days or weeks at external labs while jobs keep running.
  • Several planners change the same list.
  • A replacement needs a named person's approval, with scope and reason.

Sources

Last checked on .

Vendors change their pages. If you see a difference, email support and we correct this page.

See the planning on fictional data first.

Try the demo

No account and no sales call. The import runs in your own company workspace, not in the demo.